This forum is shutting down! Please post new discussions at community.naturalcapitalproject.org

scenario rule based

GilGil Member
Hello NatCap team,
                               I am encountering some problems while using the Scenario Generator Rule Based model. I have attached a screen shot of my problem.. can someone help me with this problem.. I will be very grateful. Thank you.
1180 x 581 - 156K

Comments

  • jdouglassjdouglass Administrator, NatCap Staff
    Would you please include your logfile so we can take a look at the particular error that caused the scenario generator to crash?  The logfile will be a text file in your workspace.

    Thanks!
  • GilGil Member
    edited April 2017
    Thank you for your reply. I have attached the  text log file below.


    C:\InVEST_3.3.3_x86\invest-3-x86>.\invest.exe scenario_generator
    (<natcap.invest.iui.modelui.ModelUI object at 0x0AAED8F0>, 'setting super to None')
    ('lastrun URI:', u'scenario_generator_lastrun_3.3.3.json')
    04/11/2017 10:46:15  root                 DEBUG    Loading <module 'natcap.invest.scenario_generator.scenario_generator' from 'C:\INVEST~1.3_X\INVEST~1\natcap\invest\scenario_generator\scenario_generator.pyc'> in frozen environment
    04/11/2017 10:46:15  root                 INFO     Logging will be saved to natcap.invest.scenario_generator.scenario_generator-log-2017-04-11--10_46_15.txt
    04/11/2017 10:46:15  root                 DEBUG    Loaded the model from natcap.invest.scenario_generator.scenario_generator
    04/11/2017 10:46:15  root                 INFO     Executing the loaded model
    04/11/2017 10:46:15  root                 INFO     Running InVEST version "3.3.3"
    04/11/2017 10:46:15  root                 INFO     Python architecture: ('32bit', 'WindowsPE')
    04/11/2017 10:46:15  root                 INFO     Disk space remaining for workspace: 268.86 GB
    ERROR 4: `D:/INVEST RESULT/Meghalaya/Scenarios/Increase_Development/Increase_development_ML.csv' not recognised as a supported file format.

    04/11/2017 10:46:15  root                 INFO     Pointing temporary directory at the workspace at D:\INVEST RESULT\Assam\Scenarios\Increase_Development
    ERROR 4: `D:\INVEST RESULT\Assam\Scenarios\Increase_Development' not recognised as a supported file format.

    04/11/2017 10:46:15  root                 INFO     Starting natcap.invest.scenario_generator.scenario_generator
    04/11/2017 10:46:15  root                 INFO     Setting tempfile.tempdir to D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp
    04/11/2017 10:46:15  natcap.invest.scenario_generator.scenario_generator INFO     Starting Scenario Generator model run...
    04/11/2017 10:46:15  natcap.invest.scenario_generator.scenario_generator INFO     Fetching and validating inputs...
    04/11/2017 10:46:15  natcap.invest.scenario_generator.scenario_generator INFO     Physical suitability weight not found in user arguments. Setting weight to 0.5
    04/11/2017 10:46:23  natcap.invest.scenario_generator.scenario_generator INFO     Calculating transition...
    04/11/2017 10:46:29  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 94.74% complete
    04/11/2017 10:46:37  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 93.76% complete
    04/11/2017 10:46:44  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 73.98% complete
    04/11/2017 10:46:46  natcap.invest.scenario_generator.scenario_generator INFO     Constraints not included.
    04/11/2017 10:46:46  natcap.invest.scenario_generator.scenario_generator INFO     Calculating proximity.
    04/11/2017 10:46:46  natcap.invest.scenario_generator.scenario_generator INFO     Calculating proximity for 1.
    04/11/2017 10:46:52  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 94.04% complete
    04/11/2017 10:46:54  natcap.invest.scenario_generator.scenario_generator INFO     Creating euclidean distance raster...
    04/11/2017 10:46:58  geoprocessing_cython INFO     Distance Transform Phase 1
    04/11/2017 10:47:03  geoprocessing_cython INFO     Distance transform phase 1 70.65% complete
    04/11/2017 10:47:06  geoprocessing_cython INFO     Distance Transform Phase 2
    04/11/2017 10:47:08  geoprocessing_cython INFO     Distance transform phase 2 8.87% complete
    04/11/2017 10:47:13  geoprocessing_cython INFO     Distance transform phase 2 29.03% complete
    04/11/2017 10:47:19  geoprocessing_cython INFO     Distance transform phase 2 50.81% complete
    04/11/2017 10:47:24  geoprocessing_cython INFO     Distance transform phase 2 71.77% complete
    04/11/2017 10:47:29  geoprocessing_cython INFO     Distance transform phase 2 93.55% complete
    04/11/2017 10:47:36  pygeoprocessing.geoprocessing INFO     ReprojectImage 40.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpc1cufr.tif, psz_message
    04/11/2017 10:47:41  pygeoprocessing.geoprocessing INFO     ReprojectImage 76.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpc1cufr.tif, psz_message
    04/11/2017 10:47:44  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpc1cufr.tif, psz_message
    04/11/2017 10:48:01  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 31.28% complete
    04/11/2017 10:48:06  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 74.61% complete
    04/11/2017 10:48:18  pygeoprocessing.geoprocessing INFO     ReprojectImage 38.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp6fcxvc.tif, psz_message
    04/11/2017 10:48:23  pygeoprocessing.geoprocessing INFO     ReprojectImage 76.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp6fcxvc.tif, psz_message
    04/11/2017 10:48:27  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp6fcxvc.tif, psz_message
    04/11/2017 10:48:41  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 45.86% complete
    04/11/2017 10:48:46  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 92.57% complete
    04/11/2017 10:48:58  pygeoprocessing.geoprocessing INFO     ReprojectImage 40.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpwka1j_.tif, psz_message
    04/11/2017 10:49:03  pygeoprocessing.geoprocessing INFO     ReprojectImage 76.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpwka1j_.tif, psz_message
    04/11/2017 10:49:06  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpwka1j_.tif, psz_message
    04/11/2017 10:49:11  pygeoprocessing.geoprocessing WARNING  this call is vectorizing which is deprecated and slow
    04/11/2017 10:49:16  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 14.52% complete
    04/11/2017 10:49:21  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 30.15% complete
    04/11/2017 10:49:26  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 45.30% complete
    04/11/2017 10:49:31  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 60.59% complete
    04/11/2017 10:49:36  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 75.53% complete
    04/11/2017 10:49:41  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 90.74% complete
    04/11/2017 10:49:51  pygeoprocessing.geoprocessing INFO     ReprojectImage 63.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpeaitdj.tif, psz_message
    04/11/2017 10:49:54  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpeaitdj.tif, psz_message
    04/11/2017 10:49:58  pygeoprocessing.geoprocessing WARNING  this call is vectorizing which is deprecated and slow
    04/11/2017 10:50:03  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 9.54% complete
    04/11/2017 10:50:08  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 18.72% complete
    04/11/2017 10:50:13  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 27.42% complete
    04/11/2017 10:50:18  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 33.31% complete
    04/11/2017 10:50:23  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 38.64% complete
    04/11/2017 10:50:28  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 43.69% complete
    04/11/2017 10:50:33  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 49.37% complete
    04/11/2017 10:50:38  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 56.52% complete
    04/11/2017 10:50:43  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 66.83% complete
    04/11/2017 10:50:48  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 78.05% complete
    04/11/2017 10:50:53  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 88.78% complete
    04/11/2017 10:50:59  natcap.invest.scenario_generator.scenario_generator INFO     Calculating proximity for 2.
    04/11/2017 10:51:05  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 97.34% complete
    04/11/2017 10:51:06  natcap.invest.scenario_generator.scenario_generator INFO     Creating euclidean distance raster...
    04/11/2017 10:51:10  geoprocessing_cython INFO     Distance Transform Phase 1
    04/11/2017 10:51:15  geoprocessing_cython INFO     Distance transform phase 1 78.80% complete
    04/11/2017 10:51:17  geoprocessing_cython INFO     Distance Transform Phase 2
    04/11/2017 10:51:20  geoprocessing_cython INFO     Distance transform phase 2 13.71% complete
    04/11/2017 10:51:26  geoprocessing_cython INFO     Distance transform phase 2 33.87% complete
    04/11/2017 10:51:31  geoprocessing_cython INFO     Distance transform phase 2 54.03% complete
    04/11/2017 10:51:36  geoprocessing_cython INFO     Distance transform phase 2 75.00% complete
    04/11/2017 10:51:41  geoprocessing_cython INFO     Distance transform phase 2 96.77% complete
    04/11/2017 10:51:47  pygeoprocessing.geoprocessing INFO     ReprojectImage 39.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp7qzlqy.tif, psz_message
    04/11/2017 10:51:52  pygeoprocessing.geoprocessing INFO     ReprojectImage 76.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp7qzlqy.tif, psz_message
    04/11/2017 10:51:55  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp7qzlqy.tif, psz_message
    04/11/2017 10:52:10  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 36.40% complete
    04/11/2017 10:52:15  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 80.65% complete
    04/11/2017 10:52:25  pygeoprocessing.geoprocessing INFO     ReprojectImage 35.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpqwvllk.tif, psz_message
    04/11/2017 10:52:31  pygeoprocessing.geoprocessing INFO     ReprojectImage 69.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpqwvllk.tif, psz_message
    04/11/2017 10:52:34  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpqwvllk.tif, psz_message
    04/11/2017 10:52:47  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 51.75% complete
    04/11/2017 10:53:03  pygeoprocessing.geoprocessing INFO     ReprojectImage 40.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpcqhwrk.tif, psz_message
    04/11/2017 10:53:08  pygeoprocessing.geoprocessing INFO     ReprojectImage 77.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpcqhwrk.tif, psz_message
    04/11/2017 10:53:11  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpcqhwrk.tif, psz_message
    04/11/2017 10:53:16  pygeoprocessing.geoprocessing WARNING  this call is vectorizing which is deprecated and slow
    04/11/2017 10:53:21  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 14.66% complete
    04/11/2017 10:53:26  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 29.10% complete
    04/11/2017 10:53:31  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 41.30% complete
    04/11/2017 10:53:36  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 53.30% complete
    04/11/2017 10:53:41  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 66.83% complete
    04/11/2017 10:53:46  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 80.22% complete
    04/11/2017 10:53:51  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 93.13% complete
    04/11/2017 10:54:01  pygeoprocessing.geoprocessing INFO     ReprojectImage 63.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpn5jjuh.tif, psz_message
    04/11/2017 10:54:04  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpn5jjuh.tif, psz_message
    04/11/2017 10:54:07  pygeoprocessing.geoprocessing WARNING  this call is vectorizing which is deprecated and slow
    04/11/2017 10:54:13  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 8.56% complete
    04/11/2017 10:54:18  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 16.83% complete
    04/11/2017 10:54:23  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 24.89% complete
    04/11/2017 10:54:28  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 31.28% complete
    04/11/2017 10:54:33  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 36.47% complete
    04/11/2017 10:54:38  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 40.74% complete
    04/11/2017 10:54:43  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 46.00% complete
    04/11/2017 10:54:48  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 51.47% complete
    04/11/2017 10:54:53  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 59.40% complete
    04/11/2017 10:54:58  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 69.35% complete
    04/11/2017 10:55:03  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 79.45% complete
    04/11/2017 10:55:08  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 89.41% complete
    04/11/2017 10:55:14  natcap.invest.scenario_generator.scenario_generator INFO     Calculating proximity for 7.
    04/11/2017 10:55:20  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 98.11% complete
    04/11/2017 10:55:21  natcap.invest.scenario_generator.scenario_generator INFO     Creating euclidean distance raster...
    04/11/2017 10:55:26  geoprocessing_cython INFO     Distance Transform Phase 1
    04/11/2017 10:55:31  geoprocessing_cython INFO     Distance transform phase 1 66.30% complete
    04/11/2017 10:55:34  geoprocessing_cython INFO     Distance Transform Phase 2
    04/11/2017 10:55:37  geoprocessing_cython INFO     Distance transform phase 2 9.68% complete
    04/11/2017 10:55:42  geoprocessing_cython INFO     Distance transform phase 2 26.61% complete
    04/11/2017 10:55:47  geoprocessing_cython INFO     Distance transform phase 2 49.19% complete
    04/11/2017 10:55:52  geoprocessing_cython INFO     Distance transform phase 2 70.97% complete
    04/11/2017 10:55:57  geoprocessing_cython INFO     Distance transform phase 2 92.74% complete
    04/11/2017 10:56:04  pygeoprocessing.geoprocessing INFO     ReprojectImage 40.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpdhmbt2.tif, psz_message
    04/11/2017 10:56:09  pygeoprocessing.geoprocessing INFO     ReprojectImage 72.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpdhmbt2.tif, psz_message
    04/11/2017 10:56:13  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmpdhmbt2.tif, psz_message
    04/11/2017 10:56:27  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 56.17% complete
    04/11/2017 10:56:32  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 97.48% complete
    04/11/2017 10:56:43  pygeoprocessing.geoprocessing INFO     ReprojectImage 35.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_hhd2v.tif, psz_message
    04/11/2017 10:56:48  pygeoprocessing.geoprocessing INFO     ReprojectImage 63.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_hhd2v.tif, psz_message
    04/11/2017 10:56:53  pygeoprocessing.geoprocessing INFO     ReprojectImage 96.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_hhd2v.tif, psz_message
    04/11/2017 10:56:54  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_hhd2v.tif, psz_message
    04/11/2017 10:57:10  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 23.98% complete
    04/11/2017 10:57:15  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 59.05% complete
    04/11/2017 10:57:20  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 92.92% complete
    04/11/2017 10:57:33  pygeoprocessing.geoprocessing INFO     ReprojectImage 38.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_z3y90.tif, psz_message
    04/11/2017 10:57:38  pygeoprocessing.geoprocessing INFO     ReprojectImage 73.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_z3y90.tif, psz_message
    04/11/2017 10:57:42  pygeoprocessing.geoprocessing INFO     ReprojectImage 100.0% complete D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp\tmp_z3y90.tif, psz_message
    04/11/2017 10:57:47  pygeoprocessing.geoprocessing WARNING  this call is vectorizing which is deprecated and slow
    04/11/2017 10:57:52  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 13.53% complete
    04/11/2017 10:57:57  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 27.35% complete
    04/11/2017 10:58:02  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 40.74% complete
    04/11/2017 10:58:07  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 54.35% complete
    04/11/2017 10:58:12  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 68.02% complete
    <div
    Post edited by Gil on
  • GilGil Member
    pygeoprocessing.geoprocessing WARNING  this call is vectorizing which is deprecated and slow
    04/10/2017 23:18:41  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 8.56% complete
    04/10/2017 23:18:46  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 17.18% complete
    04/10/2017 23:18:51  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 25.74% complete
    04/10/2017 23:18:56  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 33.94% complete
    04/10/2017 23:19:01  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 42.01% complete
    04/10/2017 23:19:06  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 50.00% complete
    04/10/2017 23:19:11  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 58.84% complete
    04/10/2017 23:19:16  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 66.90% complete
    04/10/2017 23:19:21  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 75.46% complete
    04/10/2017 23:19:26  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 84.01% complete
    04/10/2017 23:19:31  pygeoprocessing.geoprocessing INFO     raster stack calculation approx. 92.57% complete
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator INFO     Calculating priorities with land attributes table...
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator WARNING  Cover 3 suitability specified, but no change indicated.
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator WARNING  Cover 4 suitability specified, but no change indicated.
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator WARNING  Cover 5 suitability specified, but no change indicated.
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator WARNING  Cover 6 suitability specified, but no change indicated.
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator WARNING  Cover 8 suitability specified, but no change indicated.
    04/10/2017 23:19:38  natcap.invest.scenario_generator.scenario_generator WARNING  Cover 9 suitability specified, but no change indicated.
    04/10/2017 23:19:39  natcap.invest.scenario_generator.scenario_generator DEBUG    Increasing cover 1 by 73315 pixels.
    04/10/2017 23:19:45  natcap.invest.scenario_generator.scenario_generator DEBUG    Checking pixels with suitability score of 100.
    04/10/2017 23:19:45  root                 ERROR    ---------------------------------------------------
    04/10/2017 23:19:45  root                 ERROR    ---------------------- ERROR ----------------------
    04/10/2017 23:19:45  root                 ERROR    ---------------------------------------------------
    04/10/2017 23:19:45  root                 ERROR    Error: exception found while running natcap.invest.scenario_generator.scenario_generator
    04/10/2017 23:19:45  root                 DEBUG
    04/10/2017 23:19:45  root                 DEBUG    Build details
    04/10/2017 23:19:45  root                 DEBUG    Interpreter
    04/10/2017 23:19:45  root                 DEBUG    Current temp dir: D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp
    04/10/2017 23:19:45  root                 DEBUG    tempfile.tempdir: D:\INVEST RESULT\Assam\Scenarios\Increase_Development\tmp
    04/10/2017 23:19:45  root                 DEBUG
    04/10/2017 23:19:45  root                 DEBUG    System
    04/10/2017 23:19:45  root                 DEBUG    OS              : Windows-8-6.2.9200
    04/10/2017 23:19:45  root                 DEBUG    Processor architecture: AMD64
    04/10/2017 23:19:45  root                 DEBUG    FS encoding     : mbcs
    04/10/2017 23:19:45  root                 DEBUG    Preferred encoding: cp1252
    04/10/2017 23:19:45  root                 DEBUG
    04/10/2017 23:19:45  root                 DEBUG    Python
    04/10/2017 23:19:45  root                 DEBUG    Version         : 2.7.9
    04/10/2017 23:19:45  root                 DEBUG    Build           : ('default', 'Dec 10 2014 12:24:55')
    04/10/2017 23:19:45  root                 DEBUG    Compiler        : MSC v.1500 32 bit (Intel)
    04/10/2017 23:19:45  root                 DEBUG    Implementation  : CPython
    04/10/2017 23:19:45  root                 DEBUG    Architecture    : 32bit
    04/10/2017 23:19:45  root                 DEBUG    Linkage format  : WindowsPE
    04/10/2017 23:19:45  root                 DEBUG
    04/10/2017 23:19:45  root                 DEBUG    Packages
    04/10/2017 23:19:45  root                 DEBUG    Cython          : ?
    04/10/2017 23:19:45  root                 DEBUG    Numpy           : 1.11.2
    04/10/2017 23:19:45  root                 DEBUG    Scipy           : 0.16.1
    04/10/2017 23:19:45  root                 DEBUG    OSGEO           : 1.11.3
    04/10/2017 23:19:45  root                 DEBUG    Shapely         : 1.5.5
    04/10/2017 23:19:45  root                 DEBUG    InVEST          : 3.3.3
    04/10/2017 23:19:45  root                 DEBUG
    04/10/2017 23:19:45  root                 DEBUG
    04/10/2017 23:19:45  root                 DEBUG    Exception not environment-related
    04/10/2017 23:19:45  root                 DEBUG    Printing traceback
    04/10/2017 23:19:46  root                 ERROR    Exiting due to failures
    04/10/2017 23:19:46  root                 INFO     Elapsed time: 11m 38.45s
  • jdouglassjdouglass Administrator, NatCap Staff
    Hi @Gil, could you send your inputs to jdouglass@stanford.edu so I can take a look?  I think it'll be easier to debug this way than trying to decipher the logs.
Sign In or Register to comment.